Construction Measures of Metal Corrugated Culvert in Rainy Period:
1. rain construction should be arranged in advance, as far as possible in the rain before the arrival of the completion, waterproof facilities around the foundation pit, to prevent the surrounding water into the foundation pit.
2. Increase the detection frequency of sand and stone water content, adjust the concrete mix ratio in time, and ensure the concrete mixing quality.4. The formwork should be removed within one day when the temperature is low, and the concrete surface should be moisturized and preserved for no less than 7 days after the removal of the formwork.